A little cool

May 18, 2018

Today we have received confirmation that our frame-less safety railings for the front of the hotel should be fitted within the next 2-4 weeks so we will be able to leave our lovely new by-folding doors open in the lovely Blackpool sunshine.

 

Our bar air-con is due for commissioning and final install in the next 2-8 weeks so hold tight and get ready to be Blackpool cool! 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

A little, past, present and future

July 30, 2017

1/2
Please reload

Recent Posts

June 21, 2020

April 21, 2020

March 17, 2020

May 12, 2019

October 8, 2018

July 16, 2018

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

ADDRESS

419 PROMENADE

BLACKPOOL

FY1 6BQ

CONTACT

FOR CONTACT INFORMATION PLEASE VISIT OUR FAQ PAGE

SEAFRONT419

© 2017 SEAFRONT419

All rights reserved

WE ACCEPT

Show More